Southern Gloucester County Regional School District, New Jersey
Program
Delsea Regional High School initiated a 4 year phased construction project to modernize the existing building and to accommodate the growing needs of the larger student body and emerging technology needs. The project consisted of 95,686 square feet of new construction and over 40,000 square feet of renovations, constructed as part of a $19.8 million bond referendum. All work had to be planned to minimize disruption of students and staff during construction.
Features
• Music, Home Economics Rooms
• Television Performance Suite
• Full-service Kitchen
• Expansion of Cafeteria
• English/History Computer Center
• Gymnasium: 1,200 seats
• Auxiliary Gymnasium, Weight Training Room,
Locker Rooms, and Physical Education Office Suites
• 8 Science Labs, 2 Computer Labs
• 7 Classrooms
• Gymnasium converted to Instructional Media Center
• Administrative Offices converted to Guidance Suite
• North and South 2nd floor wings connected with new corridor
• Window replacement throughout
• 20 acres of athletic fields, additional parking,
extensive storm drainage improvements
• Boiler replacements
Services Provided
• Long Range Facility Planning
• Bond Referendum Services
• NJDOE Approvals
• Outside Agency Approvals
• Architecture/Engineering Services
• Enhanced Construction Phase Services
Building Additions & Renovations: 95,686 SF (Addition), 40,000 SF (Renovation)
Project Cost: $13.6 Million (Additions/Renovations), $800,000 (Athletic Fields)
Completion Date: September 1996
Click here for a printable PDF